Monday, January 31, 2011

What is this job all about?

Although it sounds rather simple, this project will be very invasive as we remove the entire front of the church. We will then install structural steel columns and a new energy efficient window system, along with a larger vestibule.  If you have ever stood next to the existing wall, (BB shot holes & single pane glass), then you know how badly this energy upgrade is needed.

This renovation will save energy while providing a beautiful stained glass pictorial depicting the ascension of Christ, designed by The Rambusch Company http://www.rambusch.com/ .  Rambusch designed and built the stained glass that was installed behind the altar around 2002.